TORcomm

Preformed Motorway/Highway communication chambers

 

torkerb

Torrent  Water Management offer TORcomm chambers  to suit  NG 1500 Highway Communications requirements. The units are preformed off site to speed up  the site installation process and reduce waste. They are manufacture from 100% recycled mixed Polymers complying with BS 5834-4 and tested to D400 loading in accordance with BSEN124. (Lloyds British)

The chamber  can be supplied with  either steps or ladders  dependent on site requirements. Chamber accessories available on request.

 

TORcomm

Length / mm
Type A
1300
Type B
750
Type C
600
Type D
2700
Type E
400
Width / mm
Type A
850
Type B
675
Type C
450
Type D
675
Type E
400
Depth / mm
Type A
900
Type B
900
Type C
550
Type D
900
Type E
550

Installation details for TORcomm chambers

Step 1 . Ensure that the  area to be excavated will allow for the chambers length, width and height and there is sufficient area for the backfill, in principle allowing 150mm for the backfill material.

Step 2 . The sub base must be well compacted to a depth of 100mm and either purpose made or an in situ concrete base should be formed making allowance for any drainage connection, sump or incoming services.

Step 3 . Place base units first and locate over services or sump outlet. Next stack units in order to achieve the desired depth, careful to  make sure steps are in order and bearers are placed correctly.

Step 4 . Backfill material can now be introduced and compacted.

Step 5 . The last 100mm  haunching is advised to be concrete in accordance with the cover specification and final loading requirements.

Methods and details for installation of TORcomm Access Chambers. These are guidelines, and not project specific. It is understood there are alternative ways that might be required and/or recommended based on site or project conditions.

Torrent Water Management Ltd reserves the right to change these guidelines and asks clients to contact the office for with any specific questions. Torrent Water Management makes no express or implied warranty or guarantee of the techniques, construction methods or materials identified herein.

The customer shall comply with all laws, regulations, codes and orders of any authority having jurisdiction over the customer and which relate to the customer’s installation, maintenance and use of Torrent Water Management products.

If the customer’s installation or use of any products contravenes any such laws, regulations, codes or orders of such authorities, the customer shall be responsible for the violations thereof and shall bear the costs, expense and damages attributable to its failure to comply with the provisions of such laws, ordinances, rules, regulations, codes or orders.